Construction management analysis of time management in residential house construction of samarinda
##plugins.themes.academic_pro.article.main##
Abstract
The construction services industry in Indonesia is expanding rapidly, necessitating efficient project management to maintain competitiveness. This study analyzes time management in residential construction in Samarinda, using the Critical Path Method (CPM) and Microsoft Project software. The research aims to identify deficiencies in current practices to enhance project efficiency. A quantitative approach was adopted, involving literature review, data collection through field surveys and interviews, and data analysis. Findings reveal that the total construction period is 93 days, with a project duration of 4,900 hours. Weather conditions were a significant factor causing incomplete tasks. Cost analysis indicates total expenses of Rp201,290,412, emphasizing the importance of precise cost management alongside time management. The study concludes that effective use of CPM and Microsoft Project can optimize scheduling, resource allocation, and overall project management. Recommendations include regular critical path reviews and enhanced team communication to mitigate delays and ensure timely project completion
##plugins.themes.academic_pro.article.details##
References
Darmawan, D., & Ratnasari, A. (2020). Rancang Bangun Sistem Informasi Manajemen Proyek Berbasis Web Pada PT Seatech Infosys. Jurnal SISFOKOM (Sistem Informasi dan Komputer), 09(03), 365-372. doi:http://dx.doi.org/10.32736/sisfokom.v9i3.931
El-Karim, M. S., El-Nawawy, O. A., & Abdel-Alim, A. M. (2017). Identification and Assesment of Risk Factors Affecting Construction. HBRC Journal, 13(2), 202-216. doi:10.1016/j.hbrcj.2015.05.001
Fatkhullah, M., Habib, M. A., & Nisa, K. K. (2022). Identifikasi dan Manajemen Risiko untuk MereduksiKerentanan Pada Masyarakat. Ekonomi, keuangan, investasi dan syariah (EKUITAS), 3(4), 856-867. doi:10.47065/ekuitas.v3i4.1529
Gerung, J. O., Dundu, A. K., & Mangare, J. B. (2016, Juli). Analisa Penerapan Manajemen Waktu Pada Pembangunan Jaringan Daerah Irigasi Sangkup Kiri. Jurnal Sipil Statik, 6(7), 441-446.
Gheffira, A., Inayah, Z. M., Teguh, R., & Oktaviany, D. (2019). Sistem Informasi Manajemen Proyek Berbasis Website Pada PT. AKM. Jurnal Teknik Informatika dan SIstem Informasi, 6(1), 62-71. Diambil kembali dari https://jurnal.mdp.ac.id/index.php/jatisi/article/view/160/97
Iluk, T., Ridwan, A., & Winarto, S. (2020). Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai Grand Pannglima Polim Kediri. JURMATEKS Jurnal Manajemen & Teknik Sipil, 3(2), 163-176.
Junaidi, F. A., Sari, S. N., & Ardian, O. H. (2023, Agustus). Analisa Rancangan Anggaran Biaya dan Penjadwalan Pada Pembangunan Dinding Penahan Tanah. Jurnal Ilmiah Teknik dan Ilmu Komputer, 3(2), 77-86. doi:https://doi.org/10.55123/storage.v2i3.2299
Kemalawati, A. (2021). Penataan Ruang Untuk Rumah Tinggal. Jurnal Adbimas Akademika, 2(1), 20-26. Diambil kembali dari https://aks-akk.e-journal.id/JAA/article/view/123/74
Kiswati, S., & Chasanah, U. (2019, Juni). Analisa Konsultan Manajemen Konstruksi Terhadap Penerapan Manajemen Waktu Pada Pembangunan Rumah Sakit di Jawa Tengah. Jurnal NeoTeknika, 5(1).
Kurnaini, T., Lalan, H., & Adli, M. (2022, Agustus). Analisa Critical Path Method (Cpm ) Pada Proyek Pembangunan Cekdam Paket 2 – Kota Padang. Ensiklopedia Education Review, 4(Vol. 4 No 2 Agustus 2022), 66-74. doi:https://doi.org/10.33559/eer.v4i2.1263
Matahelumual, M. J., Jamlaay, O., & Titaley, H. D. (2024). Analisa Perhitungan Rencana Anggaran Biaya dan Penerapan Manajemen Waktu Pada Pelaksanaan Proyek Rehab Rumdis HUBDAM XVI/PATTIMURA - Ambon. AGREGATE, 3(1), 27-36.
Moi, F., & Neny, I. (2021). Analisis Manajemen Risiko Pada Proyek Pembangunan Ruas Jalan Baru Waebetu - Tarawaja. Jurnal Talenta Sipil, 4(1), 79-84. doi: 10.33087/talentasipil.v4i1.52
Nurhayati. (2010). Manajemen Proyek. Yogyakarta.
Pasaribu, H., Tarigan, I., & Harahap, M. (2021). Manajemen Waktu Pelaksanaan Proyek Peningkatan Jalan Provinsi Pakkat-Tarabintang Di Kab. Humbang Hasundutan. Jurnal Santeksipil, 2(2), 89-95. doi:https://doi.org/10.36985/jsl.v2i2.545
Putri, Y. E., Ermawati, Y., & Anjelina, S. (2023, Oktober). Analisa Penerapan Manajemen Waktu Pada Pembangunan Rumah Type 36 Di Jalan Lintas Sumatera Desa Suko Mulyo Kecamatan Martapura Kabupaten Ogan Komering Ulu Timur. Concrete Design Journal, 1(2), 10-18. Diambil kembali dari https://www.journal.unbara.ac.id/index.php/cdj/issue/view/182
Rahmanto, T., & Janizar, S. (2022, Juli). Pengendalian Biaya dan Waktu Dengan Metode Earned Value Proyek Familia Urban Bekasi. JTSC, 3(2), 16-27. doi:10.51988/jtsc.v3i2.48
Septiawan, D. (2020, September). Analisis Penerapan Metode Critical Path Method Pada Proyek Pengadaan Furniture Masjid di Jepera Inti Kreasindo. Scientific Journal of Industrial Engineering, 2(1), 23-27. Diambil kembali dari https://jim.unindra.ac.id/index.php/sijie/article/view/70
Solis, R., Corona-Suarez, G. A., & Garcia, A. J. (2015). The Use of Project Time Management Process and the Schedule Performance of Construction Projects in Mexico. Construction Engineering(1), 1-9. doi:https://doi.org/10.1155/2015/868479
Sunarmi. (2013) . Pendekatan Pemecahan Desain Interior Rumah Tinggal. Ornamen, 10(1), 41-56.
Supriyono, H., & Sari, C. P. (2015). Pemilihan Rumah Tinggal Menggunakan Metode Weighted Product. Jurnal Ilmu Komputer Dan Informatika, 1(1), 23-28.
Tama, A. K., Anggraini, L., & Tutuko, B. (2020). Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digital Universitas Negara Semarang. Jurnal Teknik Sipil, 1-15. Diambil kembali dari https://repository.usm.ac.id/files/journalmhs/C.111.13.0203-20200903124635.pdf
Utomo, G., Hendriyani, I., & Aida, S. (2020). Evaluasi Pelaksanaan Proyek Drainase Dengan Metode CPM dan PERT. Media Ilmiah Teknik Sipil, 9(1), 44-52.
Vinahapsari, C. A., & Rosita. (2020). Pelatihan Manajemen Waktu Pada Stres Akademik Pekerja Penuh Waktu. Jurnal Bisnis Darmajaya, 06(01), 20-28.
Wibowo, P., & Rozy, N. (2020). Analisis manajemen konstruksi pembangunan gedung rawat inap kelas III RSUD waled kabupaten cirebon. Jurnal konstruksi UNSWAGATI CIREBON, IX(2), 125- 138. Diambil kembali dari file:///C:/Users/LENOVO%20GK/Downloads/3928-10731-1-PB.pdf
Widyarthara, A., Hamka, & Winarni, S. (2020). Metode Desain Arsitek Dalam Mendesain Rumah Tinggal. PAWON: Jurnal Arsitektur, 4(1), 1-12. doi:https://doi.org/10.36040/pawon.v4i01.2342