olar power has become one of the most potential resources in generating clean and sustainable electricity. In the last few decades, solar power technology has developed rapidly, especially in the field of solar panels. Solar panels use semiconductor materials such as silicon to convert sunlight radiation into electricity. On-grid solar power systems have become popular because they generate electricity while remaining parallel Syncron with PLN's power plants. This article discusses the economic analysis of installing solar roof panels in the PT GRAND Building Complex INDONESIA, on-grid solar power system design methodology, including building structure calculations, the area required for installing solar panels, solar panel sizes, sending controller settings, and inverter settings. investment that needs to be made and how many years will the capital be returned or Return Of Investment (ROI), Also describes the types of solar panels, namely monocrystalline, polycrystalline, and thin film solar cells (TFSC), as well as their advantages and disadvantages, The results of this study can provide a complete picture of how much profit is in installing solar roof panels, and modern solar power technology and its implementation on a large scale. Thus, this article is expected to contribute to scientists, engineers, and other stakeholders in the development and implementation of more effective and efficient solar power systems
##plugins.themes.academic_pro.article.details##
References
D. Persetujuan Bersama, B. I. Ketentuan, and U. Pasal, “Presiden Republik Indonesia Perwakilan Rakyat Republik Indonesia dan Presiden Republik Indonesia."
N. Sartika, Rio, A. N. R. Fajri, and L. Kamelia, “Perancangan dan Simulasi Sistem Pembangkit Listrik Tenaga Surya (PLTS) Atap Pada Masjid Jami' Al-Muhajirin Bekasi," Transmisi: Jurnal Ilmiah Teknik Elektro, vol. 25, no. 1, pp. 1–9, Feb. 2023, doi: 10.14710/transmisi.25.1.1-9
Permen ESDM Nomor 2 Tahun 2024
P. Menteri, E. Dan, and S. Daya Mineral, “Menteri Energi dan Sumber Daya Mineral Republik Indonesia."
UNDANG-UNDANG REPUBLIK INDONESIA" 2024.
KEMEN-ESDM, PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR 26 TAHUN 2021 TENTANG PEMBANGKIT LISTRIK TENAGA SURYA ATAP YANG TERHUBUNG PADA JARINGAN TENAGA LISTRIK PEMEGANG IZIN USAHA PENYEDIAAN TENAGA LISTRIK UNTUK KEPENTINGAN UMUM. KEMEN-ESDM, 2021. [Online]. Available: www.peraturan.go.id
D. P. R. R. I. dan P. R. I. Persetujuan Bersama and Ketentuan, UNDANG-UNDANG REPUBLIK INDONESJA NOMOR 30 TAHUN 2007 TENTANG ENERGI. 2007.
MENTERI ENERGl DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA, “PERATURAN MENTERI ENERGl DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR 11 TAHUN 2021 TENTANG PELAKSANAAN USAHA KETENAGALISTRIKAN,” 2021.
Presiden Republik Indonesia, UNDANG-UNDANG REPUBLIK INDONESIA NOMOR 30 TAHUN 2007 TENTANG ENERGI. 2007.
KEMENTRIAN ESDM, “Aturan Terbaru PLTS Atab.”
KEMEN-ESDM. Sistem PLTS Atap OLEH Konsumen PT. PLN., PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR 49 TAHUN 2018 TENTANG PENGGUNAAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA ATAP OLEH KONSUMEN PT PERUSAHAAN LISTRIK NEGARA (PERSERO). 2018. [Online]. Available: www.peraturan.go.id
MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA, PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR 12 TAHUN 2019 TENTANG KAPASITAS PEMBANGKIT TENAGA LISTRIK UNTUK KEPENTINGAN SENDIRI YANG DILAKSANAKAN BERDASARKAN IZIN OPERASI. 2019.
MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA, “PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR 13 TAHUN 2019 TENTANG PERUBAHAN ATAS PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL NOMOR 49 TAHUN 2018 TENTANG PENGGUNAAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA ATAP OLEH KONSUMEN PT PERUSAHAAN LISTRIK NEGARA (PERSERO),” 2019. [Online]. Available: www.peraturan.go.id
Muhammad Alfin As Siddiq 2202432018, “PERANCANGAN DESAIN DAN KONFIGURASI PEMASANGAN PANEL SURYA PRIVATE HOUSE MENGGUNAKAN TIPE ATAP DENGAN SISTEM ON GRID,” Aug. 2023.
N. Sartika, Rio, A. N. R. Fajri, and L. Kamelia, PERANCANGAN DAN SIMULASI SISTEM PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP PADA MASJID JAMI’ AL-MUHAJIRIN BEKASI, vol. 25, no. 1. Institute of Research and Community Services Diponegoro University (LPPM UNDIP), 2023. doi: 10.14710/transmisi.25.1.1-9.
Tri Surya Panel, Ideal Kemirinagn Pemasagan PLTS Indonesia. 2025.
BTI, “Bagaimana Cara Menghitung Kapasitas Kebutuhan PLTS,” Dec. 23, 2024.
Kementrian ESDM, Permen ESDM Nomor 2 Tahun 2024. Indonesia: Kementrian ESDM, 2024.
1)Faisal Afif dan 2)Awaludin Martin, “Tinjauan Potensi dan Kebijakan Energi Surya di Indonesia,” vol. 6, no. 1, pp. 43–52, 2022.
Y. Sianturi, “Pengukuran dan Analisa Data Radiasi Matahari di Stasiun Klimatologi Muaro Jambi,” Megasains, vol. 12, no. 1, pp. 40–47, Apr. 2021, doi: 10.46824/megasains.v12i1.45.
Ahmad Kurnia, “SIMULASI PERHITUNGAN INTENSITAS RADIASI DAN ENERGI SURYA DENGAN TURBO PASCAL 5.5”.
P. Komang and T. Asta, “ANALISIS EKONOMI PADA PERENCANAAN PLTS ROOFTOP DI VILLA MANUSA PROGRAM STUDI D4 TEKNIK OTOMASI JURUSAN TEKNIK ELEKTRO POLITEKNIK NEGERI BALI,” 2024.
PLN, “Biaya Investasi Atab Bagi Development, ini Hitungan -hitungan PLN,” Jun. 2022.
S. Putra, C. Rangkuti, and J. Teknik Mesin, “Perencanaan Pembangkit Listrik Tenaga Surya Secara Mandiri Untuk Rumah Tinggal,” Seminar Nasional Cendekiawan, 2016.