Analysis of the Implementation of Bridge Construction Project Risk Management
##plugins.themes.academic_pro.article.main##
Abstract
This study aims to analyze the implementation of risk management for bridge construction projects. This research is constructing a bridge in the Gayungan sub-district, Surabaya. This research uses qualitative research with a descriptive analysis approach. The types of data used in this research are primary and secondary data. The direct data collection technique uses a questionnaire technique regarding risk research to collect two opinions: the opportunities and consequences of risk. The method used is expert sampling, namely determining samples known to have experience or expertise in a field. Meanwhile, secondary data collection uses literature study techniques following the research object. Based on the results of the data and analysis, it can be concluded that the risks identified from the respondents' answers are: 18% unacceptable, 58% not expected, 17% acceptable, and 7% ignored. The handling of risks that are classified as extreme risk and high risk based on the largest source of trouble, namely by contractors with more emphasis on project implementation planning and choosing the correct method according to the situation and field conditions, as well as implementing work safety programs to create safe and safe working conditions minimize accidents in the workplace.
##plugins.themes.academic_pro.article.details##
References
Enderzon, V. Y. (2020). Identifikasi Risiko Proyek Konstruksi Flyover dan Underpass di Indonesia (Kajian Literatur). Rekayasa Sipil, 14(2), 104-111.
Enderzon, V. Y., & Soekiman, A. (2020). Manajemen Risiko Proyek Konstruksi Flyover di Indonesia dengan Metode House of Risk (HOR). Media Teknik Sipil, 18(1), 57-68.
Hazriyanti, N., Hidayat, B., & Ophiyandri, T. (2020). Manajemen risiko proyek pembangunan rumah khusus suku anak dalam (SAD) Provinsi Jambi. Rang Teknik Journal, 3(2), 269-278.
Joni, I., & Putu, G. (2012). Resiko Manajemen Proyek. Jurnal Ilmiah Teknik Sipil Vol, 16(1).
Labombang, M. (2011). Manajemen risiko dalam proyek konstruksi. SMARTek, 9(1).
Lokobal, A., Sumajouw, M. D., & Sompie, B. F. (2014). Manajemen risiko pada perusahaan jasa pelaksana konstruksi di Propinsi Papua (study kasus di Kabupaten Sarmi). Jurnal Ilmiah Media Engineering, 4(2).
Maddeppungeng, A., Wigati, R., & Faris, A. (2017). Manajemen Risiko Proyek Pembangunan Jalur Keretaapi yang Berpengaruh Terhadap Kinerja Waktu (Studi Kasus Double-Double Track Railway Jakarta, Zona Jatinegara-Bekasi). Fondasi: Jurnal Teknik Sipil, 6(2).
Maddeppungeng, A., Wigati, R., & Faris, A. (2017). Manajemen Risiko Proyek Pembangunan Jalur Keretaapi yang Berpengaruh Terhadap Kinerja Waktu (Studi Kasus Double-Double Track Railway Jakarta, Zona Jatinegara-Bekasi). Fondasi: Jurnal Teknik Sipil, 6(2).
Mulyanto, B. (2012). Manajemen Risiko Dalam Pelaksanaan Proyek Konstruksi. BANGUNAN: Teori, Praktek, Penelitian, dan Pengajaran Teknik Bangunan, 16(1).
Nisa, K., Fauzi, R., & Mulyana, R. (2020). Perancangan Manajemen Risiko Proyek Pada Spbe/e-government Berdasarkan Permen Panrb Nomor 5 Tahun 2020 (studi Kasus: Pemerintah Kabupaten Bandung). eProceedings of Engineering, 7(2).
Nurlela, N., & Suprapto, H. (2014). Identifikasi Dan Analisis Manajemen Risiko Pada Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat. Jurnal Ilmiah Desain & Konstruksi, 13(2).
Pertiwi, H. (2017). Implementasi Manajemen Risiko Berdasarkan PMBOK Untuk Mencegah Keterlambatan Proyek Area Jawa Timur (Studi Kasus: PT. Telkom). Jurnal Studi Manajemen Dan Bisnis, 4(2), 96-108.
Pertiwi, H. (2017). Implementasi Manajemen Risiko Berdasarkan PMBOK Untuk Mencegah Keterlambatan Proyek Area Jawa Timur (Studi Kasus: PT. Telkom). Jurnal Studi Manajemen Dan Bisnis, 4(2), 96-108.
Pertiwi, I. G. A. I. M., Kristinayanti, W. S., & Aryawan, I. G. M. O. (2016). Manajemen Risiko Proyek Pembangunan Underpass Gatot Subroto Denpasar. Jurnal Akuntansi, Ekonomi Dan Manajemen Bisnis, 4(1), 1-6.
Purwandono, D. K., & Pujawan, I. N. (2010). Aplikasi Model House of Risk (HOR) untuk Mitigasi Risiko Proyek Pembangunan Jalan Tol Gempol-Pasuruan. Institut Teknologi Sepuluh Nopember (ITS).
Rahmawati, N., & Tenriajeng, A. T. (2020). Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus: Proyek Pembangunan Jalan Tol Bekasi-Cawang-Kampung Melayu). Rekayasa Sipil, 14(1), 18-25.
Sepang, B. A. W., Tjakra, J., Langi, J. E. C., & Walangitan, D. R. O. (2013). Manajemen risiko keselamatan dan kesehatan kerja (K3) pada proyek pembangunan ruko Orlens Fashion Manado. Jurnal Sipil Statik, 1(4).
Setiawan, A., Walujodjati, E., & Farida, I. (2014). Analisis Manajemen Risiko pada Proyek Pembangunan Jalan Tol Cisumdawu (Studi Kasus: Development of Cileumyi-Sumedang Dawuan Toll Road Phase I). Jurnal Konstruksi, 12(1).
Soputan, G. E., Sompie, B. F., & Mandagi, R. J. (2014). Manajemen Risiko Kesehatan dan Keselamatan Kerja (K3)(Study Kasus Pada Pembangunan Gedung SMA Eben Haezar). Jurnal Ilmiah Media Engineering, 4(4).
Sujono, M. H. (2021). Analisis Manajemen Risiko Proyek Yang Berpengaruh Terhadap Waktu Pelaksanaan Proyek Pembangunan Hotel Quest By Aston Semarang. Jurnal Teknik Sipil dan Arsitektur, 26(1), 64-71.
Suparno, M. W. (2015). Manajemen Risiko Dalam Proyek Konstruksi. BANGUNAN: Teori, Praktek, Penelitian, dan Pengajaran Teknik Bangunan, 20(1).
Suwinardi, S. (2016). Manajemen Risiko Proyek. Orbith: Majalah Ilmiah Pengembangan Rekayasa dan Sosial, 12(3).
Utomo, E. S., Putradi, R. R., Chandra, H. P., & Kusumastuti, C. (2019). Manajemen Risiko Proyek Konstruksi Perbaikan Dermaga di Kota Gresik. Jurnal Dimensi Pratama Teknik Sipil, 8(2), 115-121.
Wena, M. (2015). Manajemen risiko dalam proyek konstruksi. Jurnal bangunan, 20(1-12).
Wicaksono, I. K., & Singgih, M. L. (2011). Manajemen Risiko K3 (Keselamatan dan Kesehatan Kerja) Pada Proyek Pembangunan Apartemen Puncak Permai Surabaya. In Prosiding Seminar Nasional Manajemen Teknologi XIII (Vol. 5).
Wirawan, I. G. K., Sudarsana, I. K., Purbawijaya, I. B. N., di Lombok, Q. V., & di Loh, P. P. N. K. (2015). Manajemen Risiko Pada Proyek Konstruksi Dengan Metode Fast Track Studi Kasus Proyek Qunci Villas Dan Putri Naga Komodo. Jurnal Spektran Vol, 3(2).
Yetrina, M. (2018). Pengembangan Algoritma Manajemen Risiko Proyek Konstruksi. Jurnal Optimasi Sistem Industri, 17(1), 101-112.
Yuliana, C. (2017). Manajemen Risiko Kontrak Untuk Proyek Konstruksi. Rekayasa Sipil, 11(1), 9-16.