[1]
Suramli, S., Rachman, K.A., Dewi, N.F., Novianda, D.S. and Surahman, S. 2025. Critical path analysis scheduling project with critical path method (CPM) using application microsoft project on type 78 house construction project. Enrichment : Journal of Management. 15, 2 (Jun. 2025), 73-81. DOI:https://doi.org/10.35335/enrichment.v15i2.2263.