[1]
Nurhasanah, A., Revalina, R., Usnaini, U., Rifai, M. and Prapdopo, P. 2025. Optimization of execution time for second-floor house extension using the critical path method (cpm). Enrichment : Journal of Management. 15, 2 (Jun. 2025), 140-149. DOI:https://doi.org/10.35335/enrichment.v15i2.2272.