[1]
Asrul, M.R., Angelita Tindaon, M.C., Azzahra, D.N., Wulandari, R. and Ismayanti, R. 2025. Project scheduling for swallow nest construction using the critical path method. Enrichment : Journal of Management. 15, 2 (Jun. 2025), 121-128. DOI:https://doi.org/10.35335/enrichment.v15i2.2273.