Suramli, S., Rachman, K. A., Dewi, N. F., Novianda, D. S., & Surahman, S. (2025). Critical path analysis scheduling project with critical path method (CPM) using application microsoft project on type 78 house construction project. Enrichment : Journal of Management, 15(2), 73-81. https://doi.org/10.35335/enrichment.v15i2.2263