Optimization of execution time for second-floor house extension using the critical path method (cpm)
##plugins.themes.academic_pro.article.main##
Abstract
A This study discusses the application of the Critical Path Method (CPM) to optimize the execution time of a two-story house extension project. Through network analysis, CPM helps identify the critical path and determine which activities must be prioritized to ensure the project is completed on time. The analysis results show that the project duration can be shortened to 41 days by effectively managing critical activities and utilizing float time optimally. Therefore, CPM has proven to be an effective tool in improving the scheduling efficiency of construction projects
##plugins.themes.academic_pro.article.details##
References
aprilia, rachma, dan elvia rosantina shauki. 2020. “peran masyarakat dalam pengawasan dana desa.”
b. saroinsong, fabiola, josephus i. kalangi, euis f. s. pangemanan, wawan nurmawan, dedie tooy, recky h. e. sendouw, dan jumawati r. bulawan. 2024. perencanaan dan desain lanskap untuk ameliorasi iklim mikro. bandung: cv, patra media grafindo. file:///c:/users/acer/downloads/perencanaan-dan-desain-lanskap-untuk-ameliorasi-iklim-mikro.pdf.
emka, ulil aufa. 2025. “peran desain arsitektur dalam meningkatkan kualitas ruang literasi yang adaptif” 2. https://doi.org/10.62383/realisasi.v2i1.435.
hanifah, haura, lathifa salsabillah, allisa tazkia fitri, riska mona febriani, dan rully hidayatullah. 2025. “landasan teori, penelitian relevan, kerangka berpikir dan hipotesis penelitian pendidikan” 3.
heri zulfiar, muhammad. 2018. “pemeriksaan material pada pembangunan rumah non-engineered di daerah rawan gempa dusun serut, palbapang kabupaten bantul, yogyakarta.” semesta teknika 21 (2). https://doi.org/10.18196/st.212224.
irwanto, taurina jemmy, nurul lia suryani, bernessa veda ramdha, abd rahman, dan m. anshori nurul ihsan. 2023a. “metode pelaksanaan pekerjaan pondasi bore pile pada proyek gedung baru instalasi pelayanan utama rumah sakit dr saiful anwar malang.” jurnal pengabdian teknik dan sains (jpts) 3 (01). https://doi.org/10.30595/jpts.v3i01.16523.
———. 2023b. “metode pelaksanaan pekerjaan pondasi bore pile pada proyek gedung baru instalasi pelayanan utama rumah sakit dr saiful anwar malang.” jurnal pengabdian teknik dan sains (jpts) 3 (01). https://doi.org/10.30595/jpts.v3i01.16523.
iwawo, ezekiel r m, jermias tjakra, dan pingkan a k pratasis. 2016. “penerapan metode cpm pada proyek konstruksi (studi kasus pembangunan gedung baru kompleks eben haezar manado)” 4.
jiang, wei, xinyue zheng, dan zhishan huang. 2022. “lateral pressure of poured concrete: arguments from ultra-deep diaphragm wall (120 m) construction.” applied sciences 12 (17): 8800. https://doi.org/10.3390/app12178800.
jouda, methaq azeez, dan mushtak a. k. shiker. 2024. “comparing the effectiveness of pert and cpm techniques in a house construction project: a case study.” journal européen des systèmes automatisés 57 (3): 781–85. https://doi.org/10.18280/jesa.570316.
kusumastuti, dora. 2015. “kajian terhadap kebijakan pemerintah dalam pemberian subsidi di sektor perumahan.” 2015.
liew, shaw-shong, dan deng-ing ting. 2018. “design of full top-down basement construction with drain raft concept over coastal weathered sedimentary formation in malaysia.” dalam proceedings of the 2nd international symposium on asia urban geoengineering, disunting oleh renpeng chen, gang zheng, dan changyu ou, 616–30. springer series in geomechanics and geoengineering. singapore: springer singapore. https://doi.org/10.1007/978-981-10-6632-0_48.
lokas, priska fricillia, ariestides k t dundu, dan pingkan a k pratasis. 2022. “perbandingan biaya percepatan antara penambahan tenaga kerja dan jam kerja (lembur) pada pekerjaan struktur rumah tinggal” 20.
mamani, tamara, rodrigo f. herrera, felipe muñoz-la rivera, dan edison atencio. 2022. “variables that affect thermal comfort and its measuring instruments: a systematic review.” sustainability 14 (3): 1773. https://doi.org/10.3390/su14031773.
manggolo, sabdo tri. 2023. “analisa perbandingan biaya dan waktu metode kostruksi top-down dan bottom-up pada pekerjaan basement gedung tentrem semarang.” semarang: universitas islam sultan agung. http://ejournal.utp.ac.id/index.php/jtsa/article/view/2512.
mardian, pangelius, rizal maulana, dan andrea sumarah asih. 2022. “analisis perbandingan metode top-down dan bottom- up pekerjaan basement dari segi waktu pelaksanaan pada pembangunan gedung bertingkat” 03 (01).
nopriyanto, dwi erry, esti wulandari, dan laksono djoko nugroho. 2025. “analysis of delays in construction time of the banjarsari water gate project, sidoarjo district using critical path method.” enrichment: journal of multidisciplinary research and development 3 (1): 26–38. https://doi.org/10.55324/enrichment.v3i1.334.
nur yaqin, heru, hanie teki tjendani, dan budi witjaksana. 2023. “analysis of the acceleration of time and cost of implementing building construction projects using the critical path method (cpm) method.” devotion : journal of research and community service 4 (2): 336–46. https://doi.org/10.36418/dev.v4i2.388.
okafor, marcellinus u., bankole osita awuzie, kenneth otasowie, udochukwu marcel-okafor, dan clinton aigbavboa. 2022. “evaluation of indoor thermal comfort conditions of residential traditional and modern buildings in a warm-humid climate.” sustainability 14 (19): 12138. https://doi.org/10.3390/su141912138.
plebankiewicz, edyta, krzysztof zima, dan damian wieczorek. 2021. “modelling of time, cost and risk of construction with using fuzzy logic.” journal of civil engineering and management 27 (6): 412–26. https://doi.org/10.3846/jcem.2021.15255.
putri, natasha ammara, arief saefudin, dan selvia agustina. 2024. “metode top-down manual pekerjaan pembongkaran gedung eksisting di pusat kota.” jurnal deformasi 9 (2): 178–86. https://doi.org/10.31851/deformasi.v9i2.17003.
qomariyah, siti, dan faizal hamzah. 2013. “analisis network planning dengan cpm (critical path method) dalam rangka efisiensi waktu dan biaya proyek.”
rosita, febriana ndaru. 2021. “prevalensi dan asosiasi antara depresi, kecemasan, stres, dan kualitas tidur pada mahasiswa selama pandemi covid-19.” psikodimensia 20 (2): 131–43. https://doi.org/10.24167/psidim.v20i2.3507.
rumbyarso, yonas prima arga. 2021. “perencanaan struktur bangunan atas (upper structure) gedung stie bank bpd jateng kota semarang” 24 (1).
sari, ninditya mustika. 2015. “metode pelaksanaan pembangunan proyek apartemen one east surabaya dengan metode top-down.” surabaya: institut teknologi sepuluh nopember.
sofia, dewi ayu, dan ananda aulia eka putri. 2021. “analisis perbandingan penambahan jam kerja dan tenaga kerja terhadap waktu dan biaya proyek dengan metode time cost trade off.”
sutarto, agung, dan abdullah jalil. 2023. “analisis daya dukung pondasi terhadap penambahan lantai dengan struktur atap plat beton gedung rumah sakit unimus.” citizen : jurnal ilmiah multidisiplin indonesia 3 (2): 77–83. https://doi.org/10.53866/jimi.v3i2.235.
victory, jeffrey. 2025. “analisis perbandingan perencanaan dan pelaksanaan pada time schedule pembangunan struktur ruko 3 lantai dengan metode cpm dan pert (studi kasus : regency piayu)” 6 (1).
wardana, m hasbil izza, dan irawan agustiar. 2025. “9 penerapan metode cpm dan time-cost trade-off dalam mengelola waktu s erta biaya proyek kons truks i x” 14.
wardani, n m e, s musdalifah, dan d lusiyanti. 2018. “optimalisasi biaya dan waktu pelaksanaan proyek pembangunan perumahan citraland palu menggunakan metode program evaluation and review technique (pert) – critical path method (cpm).” jurnal ilmiah matematika dan terapan 15 (2): 197–208. https://doi.org/10.22487/2540766x.2018.v15.i2.11353.
yang, cynthia fan. 2021. “are the property tax burdens of permanent homeowners affected by growth in housing rentals and second homes: evidence based on big data from florida* keith ihlanfeldt.”
yuan, x. p., l. guerit, j. braun, d. rouby, dan c. m. shobe. 2022. “thickness of fluvial deposits records climate oscillations.” journal of geophysical research: solid earth 127 (4): e2021jb023510. https://doi.org/10.1029/2021jb023510.
yulistya, yusnia hanna, dan josephine roosandriantini. 2021. “taman kanak kanak bagi penyandang autisme dengan pendekatan arsitektur perilaku.” nature: national academic journal of architecture 8 (2): 94. https://doi.org/10.24252/nature.v8i2a1.