Published: 2025-06-30

Compensation and employee performance: mediation of work motivation

Wahid Sumarjo, Haerofiatna Haerofiatna, Dian Wirtadipura, Tajudin Tajudin

Page : 43-51

: https://doi.org/10.35335/enrichment.v15i2.2252
Abstract views : 642 times | PDF : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2253
Abstract views : 209 times | PDF : 0 times

The mediating role of psychological well-being: Job stress on turnover intention

Dian Wirtadipura, Abdul Wahid Alfarizi, Priatna Wijaya

Page : 64-72

: https://doi.org/10.35335/enrichment.v15i2.2257
Abstract views : 367 times | PDF : 0 times

Critical path analysis scheduling project with critical path method (CPM) using application microsoft project on type 78 house construction project

Suramli Suramli, Karenina Aulia Rachman, Nanda Fitria Dewi, Dea Salsa Novianda, Surahman Surahman

Page : 73-81

: https://doi.org/10.35335/enrichment.v15i2.2263
Abstract views : 336 times | PDF : 0 times

Optimization of patane toraja construction implementation time using critical path method

Putri Sumbung, Adila Aisyah Putri, Surahman Surahman

Page : 82-91

: https://doi.org/10.35335/enrichment.v15i2.2264
Abstract views : 139 times | PDF : 0 times

Time efficiency analysis of single floor shophouse construction project using the CPM (Critical Part Method)

Surahman Surahman, Yosafat Henry Radityatama, Ahmad Padillah, Satryawati Satryawati

Page : 92-100

: https://doi.org/10.35335/enrichment.v15i2.2266
Abstract views : 191 times | PDF : 0 times

Application of project management using the critical path method (CPM) in residential construction projects

Satryawati Satryawati, Umi Zunaidah, Eny Lathifa Qumairo, Selviana Nurhalizah, Wyenda Tambing

Page : 101-110

: https://doi.org/10.35335/enrichment.v15i2.2267
Abstract views : 329 times | PDF : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2274
Abstract views : 226 times | PDF : 0 times

Project scheduling for swallow nest construction using the critical path method

Muhamad Rizki Asrul, Merry Christina Angelita Tindaon, Dita Nabila Azzahra, Rani Wulandari, Rika Ismayanti

Page : 121-128

: https://doi.org/10.35335/enrichment.v15i2.2273
Abstract views : 147 times | PDF : 0 times

Optimization of 4-Storey Shophouse Construction Project Schedule Using Microsoft Project- Based CPM Method

Friska Wanda Betteng, Firza Andhika Dirgantari, Siska Wulandari, Surahman Surahman, Suramli Suramli

Page : 129-139

: https://doi.org/10.35335/enrichment.v15i2.2269
Abstract views : 149 times | PDF : 0 times

Optimization of execution time for second-floor house extension using the critical path method (cpm)

Andi Nurhasanah, Rizsyawal Revalina, Usnaini Usnaini, Muhammad Rifai, Prapdopo Prapdopo

Page : 140-149

: https://doi.org/10.35335/enrichment.v15i2.2272
Abstract views : 132 times | PDF : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2276
Abstract views : 134 times | PDF : 0 times