Project scheduling for swallow nest construction using the critical path method

##plugins.themes.academic_pro.article.main##

Muhamad Rizki Asrul
Merry Christina Angelita Tindaon
Dita Nabila Azzahra
Rani Wulandari
Rika Ismayanti

Abstract

Indonesia is a major producer of swallow nests with high export value, but constructing swallow houses remains challenging due to biological and technical complexities. This study aimed to develop a more efficient construction schedule using the Critical Path Method (CPM). CPM was chosen to identify activity paths that directly influenced project duration, thereby minimizing delay risks. A quantitative approach was used through a case study of a four-storey swallow house project in Batua Village, Kutai Kartanegara. Data were collected via observation, interviews, and technical documentation, and analyzed using Microsoft Project to determine critical paths and estimated durations. The analysis revealed that out of 42 activities, several were on the critical path with zero slack. By focusing on these critical activities, the project duration was reduced from the original 220 calendar days to 184 days. This demonstrated that CPM effectively increased scheduling efficiency by aligning with both the biological and technical requirements of swallow nest construction. The findings provided valuable insights for swallow house developers to implement more structured and efficient planning, while also encouraging integration between civil and ecological engineering in specialized construction practices

##plugins.themes.academic_pro.article.details##

How to Cite
Asrul, M. R., Angelita Tindaon, M. C., Azzahra, D. N., Wulandari, R., & Ismayanti, R. (2025). Project scheduling for swallow nest construction using the critical path method. Enrichment : Journal of Management, 15(2), 121-128. https://doi.org/10.35335/enrichment.v15i2.2273

References

Akbar, E. A. (2019). Analisa Mobilisasi pada Diving Support Vessel Proyek Underwater Inspection (Studi Kasus: Proyek Inspection, Maintenance & Repair Campaign).
Aprillia, S. C., & A’yun, Q. Q. (2023). Optimalisasi Biaya dan Waktu Pelaksanaan Pembangunan rumah tinggal di Kecamatan Rantau Pulung Kutai Timur menggunakan Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT).
Aulady, M. F. N., & Orleans, C. (2016). Perbandingan Durasi Waktu Proyek Konstruksi AntaraMetode CriticalPathMethod (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut). Jurnal IPTEK, 20(1), 13. https://doi.org/10.31284/j.iptek.2016.v20i1.29
Badan Pusat Statistik Indonesia. (2023). Ekspor Sarang Burung menurut Negara Tujuan Utama, 2012-2023—Tabel Statistik. https://www.bps.go.id/id/statistics-table/1/MjAyMiMx/ekspor-sarang-burung-menurut-negara-tujuan-utama--2012-2023.html
Bambang Heriyanto, Hansen Rusliani, & Hareastoma Hareastoma. (2024). Analisis Pengelolaan Usaha Dalam Meningkatkan Pendapatan Sarang Burung Walet Di Desa Sungai Aur Kecamatan Kumpeh Ilir Kabupaten Muaro Jambi Provinsi Jambi. Jurnal Penelitian Ekonomi Manajemen dan Bisnis, 3(2), 227–242. https://doi.org/10.55606/jekombis.v3i2.3518
Ervianto, W. I. (2023). MANAJEMEN PROYEK KONSTRUKSI. Penerbit Andi.
Hakim, A. L., Yulianto, T., & Nugroho, M. W. (2023). Optimalisasi Waktu dan Biaya Menggunakan Metode Crashing Program pada Proyek Gedung BPJS Tulungagung. Briliant: Jurnal Riset dan Konseptual, 8(1), 241. https://doi.org/10.28926/briliant.v8i1.1083
Idrus, I., & Umar, B. (2024). Rancang Bangun Desain Sarang Burung Walet Bagi Warga Masyarakat Kelurahan Talaka Kecamatan Ma’rang Kabupaten Pangkep. Jurnal Pengabdian Masyarakat Konstruksi, 2(1), Article 1.
Kirana, S. N., Baidhowi, M. F., Maharani, R. T., & Ratri, Y. (2023). KONSEP ARSITEKTUR BERKELANJUTAN DALAM PERANCANGAN RUMAH BURUNG WALET.
Kuang, S., Sahputra, R., & Tawil, H. (2024). Analisis Faktor-Faktor Yang Mempengaruhi Perencanaan Optimal Rumah Sarang Burung Walet di Kalimantan Barat. Jurnal Ilmu Pendidikan, 1.
Laksmana, S. P., Wijoyo, A., Rauf, D. I., Burhanudin, M., & Wicaksono, D. (2022). Perencanaan Manajemen Proyek Pembangunan Usaha Rumah Kost Millenial di Pamulang. OKTAL : Jurnal Ilmu Komputer dan Sains, 1(11), Article 11.
Neni Utami, Muhammad Yoga Aditia, & Binti Nur Asiyah. (2023). Penerapan Manajemen POAC (Planning, Organizing, Actuating Dan Controlling) Pada Usaha Dawet Semar Di Kabupaten Blitar. Jurnal Penelitian Ekonomi Manajemen dan Bisnis, 2(2), 36–48. https://doi.org/10.55606/jekombis.v2i2.1522
Qordhowi, A. F. Y. A., & Fendrawan, R. (2025). Analisis efektifitas penerapan Critical Path Method (CPM) pada proyek pembangunan tanggul Kali Lamong Kabupaten Gresik. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(1), Article 1. https://doi.org/10.31004/jutin.v8i1.36105
Rahmanto, T., & Janizar, S. (2022). PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PROYEK FAMILIA URBAN BEKASI. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 3(2), Article 2. https://doi.org/10.51988/jtsc.v3i2.48
Romdona, S., Junista, S. S., & Gunawan, A. (2025). TEKNIK PENGUMPULAN DATA: OBSERVASI, WAWANCARA DAN KUESIONER. JISOSEPOL: Jurnal Ilmu Sosial Ekonomi dan Politik, 3(1), 39–47. https://doi.org/10.61787/taceee75
Saputra, I. H., Erina, Y., & Rodhi, N. N. (2024). Analisis Pengendalian Waktu dan Biaya Proyek Konstruksi Dengan Metode CPM (Critical Path Method). Innovative: Journal Of Social Science Research, 4(6), 7797–7807.
Saudi, A. I., Nurdin, A., & Yusman. (2021). Pendekatan Pendekatan Metode Jalur Kritis Pada Pekerjaan Peningkatan Ruas Jalan Transmigrasi Piriang Tapiko: BANDAR: JOURNAL OF CIVIL ENGINEERING, 3(1), 1–9. https://doi.org/10.31605/bjce.v3i1.928
Setiawan, T. H. (2013). STUDI PENELITIAN PEMBANGUNAN RUMAH WALET STUDI KASUS RUMAH WALET RAWALUKU PROPINSI BANDAR LAMPUNG. Jurnal Teknik Sipil, 12(2). https://doi.org/10.24002/jts.v12i2.608
Sigit, R. A. P., Al-Muqaffa, F. W., & Sutrisno, S. (2024). Evaluasi Penjadwalan Waktu Pada Proyek Pembangunan Rumah dengan Metode CPM (Studi Kasus: Pembangunan Rumah Tinggal di Perumnas Kabupaten Karawang). Go-Integratif : Jurnal Teknik Sistem dan Industri, 4(02), 148–157. https://doi.org/10.35261/gijtsi.v4i02.10876
Siregar, A. C. (2019). Penggunaan critical path method (CPM) untuk evaluasi waktu dan biaya pelaksanaan proyek | Siregar | Teknika: Jurnal Sains dan Teknologi. https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/6816/4722
Soeparyanto, T. S., Nuhun, R., Ariatno, H., & Zulfitrah, L. O. M. (2024). Analysis Of Project Scheduling Using The CPM Method (Case Study Of Prayer Room Construction In PT. X Empalecement Complex). Journal of Civil Engineering and Planning (JCEP), 5(1), 16–24.
Susilowati, E. (2018). PENGATURAN TERHADAP PEMBANGUNAN GEDUNG SARANG BURUNG WALET DI KOTA PALANGKA RAYA PROVINSI KALIMANTAN TENGAH. 4.
Usman, Harlina, S., & Rizaldy, A. (2019). Rancangan Bangunan Sistem Pengendali Suhu Kelembaban Dan Cahaya Pada Rumah Walet Berbasis Microkontroler. e-Jurnal JUSITI (Jurnal Sistem Informasi dan Teknologi Informasi), 82, 131–140. https://doi.org/10.36774/jusiti.v8i2.614
Wijaya, M. S., Ismiyah, E., & Rizqi, A. W. (2022). Penjadwalan Proyek Instalasi Castable In Rotary Kiln Dengan Metode Critical Path Method (CPM). 19(2).
Yulistya, Y. H., & Roosandriantini, J. (2022). Kajian Elemen Arsitektur Modern berdasarkan teori Vitruvius. Jurnal Lingkungan Karya Arsitektur, 1(2), Article 2. https://doi.org/10.37477/lkr.v1i2.253