Diterbitkan: 2025-06-30

Compensation and employee performance: mediation of work motivation

Wahid Sumarjo, Haerofiatna Haerofiatna, Dian Wirtadipura, Tajudin Tajudin

Page : 43-51

: https://doi.org/10.35335/enrichment.v15i2.2252
Abstrak views : 1253 times | PDF (English) : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2253
Abstrak views : 345 times | PDF (English) : 0 times

The mediating role of psychological well-being: Job stress on turnover intention

Dian Wirtadipura, Abdul Wahid Alfarizi, Priatna Wijaya

Page : 64-72

: https://doi.org/10.35335/enrichment.v15i2.2257
Abstrak views : 523 times | PDF (English) : 0 times

Critical path analysis scheduling project with critical path method (CPM) using application microsoft project on type 78 house construction project

Suramli Suramli, Karenina Aulia Rachman, Nanda Fitria Dewi, Dea Salsa Novianda, Surahman Surahman

Page : 73-81

: https://doi.org/10.35335/enrichment.v15i2.2263
Abstrak views : 630 times | PDF (English) : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2264
Abstrak views : 223 times | PDF (English) : 0 times

Time efficiency analysis of single floor shophouse construction project using the CPM (Critical Part Method)

Surahman Surahman, Yosafat Henry Radityatama, Ahmad Padillah, Satryawati Satryawati

Page : 92-100

: https://doi.org/10.35335/enrichment.v15i2.2266
Abstrak views : 269 times | PDF (English) : 0 times

Application of project management using the critical path method (CPM) in residential construction projects

Satryawati Satryawati, Umi Zunaidah, Eny Lathifa Qumairo, Selviana Nurhalizah, Wyenda Tambing

Page : 101-110

: https://doi.org/10.35335/enrichment.v15i2.2267
Abstrak views : 524 times | PDF (English) : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2274
Abstrak views : 307 times | PDF (English) : 0 times

Project scheduling for swallow nest construction using the critical path method

Muhamad Rizki Asrul, Merry Christina Angelita Tindaon, Dita Nabila Azzahra, Rani Wulandari, Rika Ismayanti

Page : 121-128

: https://doi.org/10.35335/enrichment.v15i2.2273
Abstrak views : 213 times | PDF (English) : 0 times

Optimization of 4-Storey Shophouse Construction Project Schedule Using Microsoft Project- Based CPM Method

Friska Wanda Betteng, Firza Andhika Dirgantari, Siska Wulandari, Surahman Surahman, Suramli Suramli

Page : 129-139

: https://doi.org/10.35335/enrichment.v15i2.2269
Abstrak views : 217 times | PDF (English) : 0 times

Optimization of execution time for second-floor house extension using the critical path method (cpm)

Andi Nurhasanah, Rizsyawal Revalina, Usnaini Usnaini, Muhammad Rifai, Prapdopo Prapdopo

Page : 140-149

: https://doi.org/10.35335/enrichment.v15i2.2272
Abstrak views : 190 times | PDF (English) : 0 times
: https://doi.org/10.35335/enrichment.v15i2.2276
Abstrak views : 183 times | PDF (English) : 0 times