Analysis of time efficiency in the implementation of a 2-story shophouse construction project on Jl. Pasundan Samarinda using the CPM (Critical Path Method)
##plugins.themes.academic_pro.article.main##
Abstract
Delays in project execution are one of the main challenges that can significantly affect the cost and quality of the work results. This study aims to evaluate the time efficiency of the construction project of a two-story shop house on Jl. Pasundan, Samarinda by applying the Critical Path Method (CPM). This method is used to identify the critical path of the project, which is a series of activities that determine the shortest completion time of the project and have no time slack (float). This study applies a quantitative descriptive approach through case study methods, relying on primary data from interviews and field observations as well as secondary data in the form of project documents. The analysis shows that the project has a critical path in the order of activities A → B → C → D → E → F → G → H → L → M → N → O → P → Q, with a total working time of 108 days. Each activity on the critical path has a total float of zero, indicating that delays in these activities will directly affect the entire project schedule. The use of the CPM method in this project has proven successful in providing a comprehensive picture of time control and can serve as a basis for decision-making in medium-sized construction project management
##plugins.themes.academic_pro.article.details##
References
Arifudin, R. (2012). Optimasi Penjadwalan Proyek Dengan Penyeimbangan Biaya Menggunakan Kombinasi Cpm Dan Algoritma Genetika. Jurnal Masyarakat Informatika, 2(4), 1–14. https://doi.org/10.14710/jmasif.2.4.1-14
Asba, A., & Altarans, I. (2024). Optimalisasi Pelaksanaan Proyek Kontruksi Dengan Menggunakan Metode Pert Dan Cpm (Studi Kasus Peningkatan Jalan Toloa Kota Tidore Kepulauan). Jurnal Akbar Juara, 9(1), 1–12.
Astari, N. M., Subagyo, A. M., & Kusnadi, K. (2022a). Perencanaan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) Dan Pert (Program Evaluation And Review Technique). Konstruksia, 13(1), 164. https://doi.org/10.24853/jk.13.1.164-180
Astari, N. M., Subagyo, A. M., & Kusnadi, K. (2022b). Perencanaan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) Dan Pert (Program Evaluation and Review Technique). Konstruksia, 13(1), 164. https://doi.org/10.24853/jk.13.1.164-180
Husen, A. (2009). lr. Abrar Husen, MT. 5.
Husna, R. A., Ilmiyah, N. F., & Resti, N. C. (2022). Implementasi CPM dan PERT dalam Memprediksi Durasi serta Biaya Pembangunan Musala Al-Ikhlas di Kotawaringin Barat. Journal Focus Action of Research Mathematic (Factor M), 5(1), 97–109. https://doi.org/10.30762/f_m.v5i1.633
Perdana, M. A., & Sari, R. P. (2022). Optimalisasi Waktu Pelaksanaan Proyek Konstruksi Rumah Tinggal Menggunakan Metode CPM (Critical Path Method) dan PERT (Program Evaluation and Review Technique). Jurnal Media Teknik dan Sistem Industri, 6(2), 116. https://doi.org/10.35194/jmtsi.v6i2.1944
Pratama, A. Y., & Kartini, I. A. N. (2020). Analisis Perencanaan Dan Penjadwalan Proyek Pembangunan Rumah Kos Menggunakan Network Planing Pert Dan Cpm Di Kota Surabaya. JEM17: Jurnal Ekonomi Manajemen, 5(1). https://doi.org/10.30996/jem17.v5i1.3619
Priadana, S., & Sunarsi, D. (2021). Metode Penelitian Kuantitatif. Pascal Books. https://books.google.co.id/books?hl=id&lr=&id=9dZWEAAAQBAJ&oi=fnd&pg=PR2&dq=metode+penelitian+kuantitatif&ots=1feIL73pJd&sig=vBPtUux-HKVfS-Drvx0kmMpwAPo&redir_esc=y#v=onepage&q=metode%20penelitian%20kuantitatif&f=false
Rahardjo, M. (2022). Penerapan Metode Studi Kasus Dalam Penelitian Kualitatif. https://doi.org/10.5281/zenodo.11180129
Rika Widianita, D. (2023). No 主観的健康感を中心とした在宅高齢者における 健康関連指標に関する共分散構造分析Title. AT-TAWASSUTH: Jurnal Ekonomi Islam, VIII(I), 1–19.
Sholahuddin, Moh., & Octavia, Y. N. (2024). Penerapan Critical Path Method (Cpm) Pada Proyek Rekonstruksi Jalan Untuk Mengidentifikasi Kegiatan Pekerjaan Jalur Kritis. DEARSIP : Journal of Architecture and Civil, 4(02), 72–84. https://doi.org/10.52166/dearsip.v4i02.7822
Sulistia, D., & Agustina, I. D. (2023). Penjadwalan Proyek Dengan Kurva-S Pada Pembangunan Perumahan Di Kota Bekasi. Jurnal Al Ulum LPPM Universitas Al Washliyah Medan, 11(2), 100–106. https://doi.org/10.47662/alulum.v11i2.540
Suprihanto, J. (2014). Manajemen. Gadjah Mada University Press.
Aggraini, N., & Kartini, I. A. N. (2021). PENERAPAN WAKTU PENYELESAIAN PROYEK DENGAN METODE CPM (Critical Path Method)” STUDI KASUS: Pembuatan Jembatan Timbang Di Gudang PPGK Milik PT GARAM (PERSERO). JEM17: Jurnal Ekonomi Manajemen, 6(1). https://doi.org/10.30996/jem17.v6i1.5273
Arifudin, R. (2012). Optimasi Penjadwalan Proyek Dengan Penyeimbangan Biaya Menggunakan Kombinasi Cpm Dan Algoritma Genetika. Jurnal Masyarakat Informatika, 2(4), 1–14. https://doi.org/10.14710/jmasif.2.4.1-14
Asba, A., & Altarans, I. (2024). Optimalisasi Pelaksanaan Proyek Kontruksi Dengan Menggunakan Metode Pert Dan Cpm (Studi Kasus Peningkatan Jalan Toloa Kota Tidore Kepulauan). Jurnal Akbar Juara, 9(1), 1–12.
Astari, N. M., Subagyo, A. M., & Kusnadi, K. (2022a). Perencanaan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) Dan Pert (Program Evaluation And Review Technique). Konstruksia, 13(1), 164. https://doi.org/10.24853/jk.13.1.164-180
Astari, N. M., Subagyo, A. M., & Kusnadi, K. (2022b). Perencanaan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) Dan Pert (Program Evaluation and Review Technique). Konstruksia, 13(1), 164. https://doi.org/10.24853/jk.13.1.164-180
Husen, A. (2009). lr. Abrar Husen, MT. 5.
Husna, R. A., Ilmiyah, N. F., & Resti, N. C. (2022). Implementasi CPM dan PERT dalam Memprediksi Durasi serta Biaya Pembangunan Musala Al-Ikhlas di Kotawaringin Barat. Journal Focus Action of Research Mathematic (Factor M), 5(1), 97–109. https://doi.org/10.30762/f_m.v5i1.633
Perdana, M. A., & Sari, R. P. (2022). Optimalisasi Waktu Pelaksanaan Proyek Konstruksi Rumah Tinggal Menggunakan Metode CPM (Critical Path Method) dan PERT (Program Evaluation and Review Technique). Jurnal Media Teknik dan Sistem Industri, 6(2), 116. https://doi.org/10.35194/jmtsi.v6i2.1944
Pratama, A. Y., & Kartini, I. A. N. (2020). Analisis Perencanaan Dan Penjadwalan Proyek Pembangunan Rumah Kos Menggunakan Network Planing Pert Dan Cpm Di Kota Surabaya. JEM17: Jurnal Ekonomi Manajemen, 5(1). https://doi.org/10.30996/jem17.v5i1.3619
Priadana, S., & Sunarsi, D. (2021). Metode Penelitian Kuantitatif. Pascal Books. https://books.google.co.id/books?hl=id&lr=&id=9dZWEAAAQBAJ&oi=fnd&pg=PR2&dq=metode+penelitian+kuantitatif&ots=1feIL73pJd&sig=vBPtUux-HKVfS-Drvx0kmMpwAPo&redir_esc=y#v=onepage&q=metode%20penelitian%20kuantitatif&f=false
Rahardjo, M. (2022). Penerapan Metode Studi Kasus Dalam Penelitian Kualitatif. https://doi.org/10.5281/zenodo.11180129
Rika Widianita, D. (2023). No 主観的健康感を中心とした在宅高齢者における 健康関連指標に関する共分散構造分析Title. AT-TAWASSUTH: Jurnal Ekonomi Islam, VIII(I), 1–19.
Sholahuddin, Moh., & Octavia, Y. N. (2024). Penerapan Critical Path Method (Cpm) Pada Proyek Rekonstruksi Jalan Untuk Mengidentifikasi Kegiatan Pekerjaan Jalur Kritis. DEARSIP : Journal of Architecture and Civil, 4(02), 72–84. https://doi.org/10.52166/dearsip.v4i02.7822
Sulistia, D., & Agustina, I. D. (2023). Penjadwalan Proyek Dengan Kurva-S Pada Pembangunan Perumahan Di Kota Bekasi. Jurnal Al Ulum LPPM Universitas Al Washliyah Medan, 11(2), 100–106. https://doi.org/10.47662/alulum.v11i2.540
Suprihanto, J. (2014). Manajemen. Gadjah Mada University Press.