Diterbitkan: 2026-06-30

Critical path method (CPM) for scheduling a type 36 residential house construction at Grand Permata Hijau housing, Samarinda city

Khoirur Rosidin, Maulana Hamdan Rifa’i, Deddy Pramana Zulkarnain, Surahman Surahman, Tandi Kadang

Page : 75-84

: https://doi.org/10.35335/enrichment.v16i2.2495
Abstrak views : 226 times | PDF (English) : 0 times

Optimization of inventory management to fulfill consumer demand at odriigo fashion

Janadi Rammelsbergi Thamrin, Willy Agustian, Tengku Ine Hendriana, Ervie Nur Afifa Mukhlis

Page : 115-124

: https://doi.org/10.35335/enrichment.v16i2.2513
Abstrak views : 151 times | PDF (English) : 0 times
: https://doi.org/10.35335/enrichment.v16i2.2510
Abstrak views : 122 times | PDF (English) : 0 times

The influence of service quality on customer satisfaction: a study on frame check service at PT Daya Adicipta Motora Bandung

Ade Oki Pebiansyah, Gumi Gumilang Wirakanda, Ervie Nur Afifa M, Ajeng Oktaviani

Page : 105-114

: https://doi.org/10.35335/enrichment.v16i2.2512
Abstrak views : 146 times | PDF (English) : 0 times